For US renewable & storage developers

Every project changes. Keep the evidence connected.

Trace queue changes, compare site evidence and prepare the next engineer review.

Concept preview · Simulated data
Original architectural relief of fictional solar, battery storage and substation sites
Cedar Junction StorageSource revision · 19 Oct 2026
Mesa Reach SolarAssumption unverified
↓Follow the evidence
01 / The change

A new date.
A new question.

Queue information changes. See the difference, compare the sources and follow the evidence into the next decision.

Scroll to inspect the source ↓
Expected study date · SYN-101
15 Dec 2026 → 12 Jan 2027
Synthetic revision
19 Oct 2026

05 Oct 2026 snapshot

OCTNOVDECJANFEBMAR
Expected study
Application
Study evidence
Next milestone

19 Oct 2026 snapshot

OCTNOVDECJANFEBMAR
Expected study
Application
Study evidence
Next milestone
○ Prior source value retained● Changed field, not an approval
02 / The evidence gap

The dates don’t always tell the same story.

A queue snapshot, an older study note and an incomplete checklist can describe the same project differently. Keep those differences visible.

Why an evidence record matters ↗
Evidence register / SYN-1013 sources
05 OCT19 OCT 2026REVIEW
01Queue snapshot19 Oct 2026Current revision+

Expected study date moved to 12 Jan 2027. The prior value remains in the record.

QUEUE-SYN-101 · ROW 14
02Study summaryEarlier snapshotOlder evidence+

The summary predates the queue revision. It cannot explain the change without further review.

SYNTHETIC REFERENCE · HUMAN REVIEW
03Requirement setNot configuredEvidence gap+

No actual tariff rules are loaded. Application completeness cannot be established.

SYNTHETIC REFERENCE · HUMAN REVIEW
Different dates. One traceable record.DEMO
Context, with a source

A public queue snapshot is not an ISO study or utility capacity approval. FERC reform and Berkeley Lab queue research describe the wider problem.

04 / Five jobs. Five deliverables.

Evidence for each stage
of interconnection.

Explore all five products ↗
Five products. One evidence trail.Scroll to explore ↓
01 / Queue changes

Cited event brief

Monitor dated queue revisions and turn each material change into a cited event brief.

Explore Grid Desk →
Proposed module · Synthetic preview
Expected study date · SYN-101
15 Dec 2026 → 12 Jan 2027
Synthetic revision
19 Oct 2026

05 Oct 2026 snapshot

OCTNOVDECJANFEBMAR
Expected study
Application
Study evidence
Next milestone

19 Oct 2026 snapshot

OCTNOVDECJANFEBMAR
Expected study
Application
Study evidence
Next milestone
○ Prior source value retained● Changed field, not an approval
02 / Site evidence

Two-site evidence pack

Put queue context, available constraint evidence, study assumptions and missing information side by side.

Explore Grid Review →
Proposed module · Synthetic preview
SYN-101

Cedar Junction Storage

Assumption unverified
SYN-102

Mesa Reach Solar

Study missing
03 / Application preflight

Missing-items checklist

Compare application materials against a configured, dated requirement set and surface exceptions.

Explore Grid Proof →
Proposed module · Synthetic preview
Evidence register / SYN-1013 sources
05 OCT19 OCT 2026REVIEW
01Queue snapshot19 Oct 2026Current revision+

Expected study date moved to 12 Jan 2027. The prior value remains in the record.

QUEUE-SYN-101 · ROW 14
02Study summaryEarlier snapshotOlder evidence+

The summary predates the queue revision. It cannot explain the change without further review.

SYNTHETIC REFERENCE · HUMAN REVIEW
03Requirement setNot configuredEvidence gap+

No actual tariff rules are loaded. Application completeness cannot be established.

SYNTHETIC REFERENCE · HUMAN REVIEW
Different dates. One traceable record.DEMO
04 / Study comparison

Engineer review workspace

Review supplied study scenarios in one workspace, with source links and an explicit engineer decision.

Explore Grid Signal →
Proposed module · Synthetic preview
Supplied scenario comparisonIllustrative
Evidence fieldScenario AScenario B
Queue snapshot05 Oct19 Oct
Expected study15 Dec 202612 Jan 2027
Capacity evidenceUnverifiedUnverified
Study materialOlder summaryNot supplied
!

Different assumptions.
Engineer review required.

Synthetic supplied inputs · No grid study performed
05 / Milestone tracking

Portfolio exposure record

Track post-submission milestones, open questions and portfolio exposure with a named owner and next action.

Explore Grid Report →
Proposed module · Synthetic preview
Portfolio / next actions2 sites
SYN-101

Cedar Junction

12 Jan 2027

Review revised dateNamed engineer · next action

SYN-102

Mesa Reach

Date unknown

Obtain study materialNamed engineer · next action

DEMO · Fixed illustrative recordsNo live telemetry
01 / 05Skip section ↓

Five separately scoped proposed offers. Availability and prices remain evaluation hypotheses.

05 / Follow one changed record

One case.
Four clearer questions.

Skip the story ↓

01 / Snapshot

A new date. A new question.

The expected study date moves between two fixed snapshots. Both source values remain visible.

DEMO · SYNTHETIC DATA
Expected study date · SYN-101
15 Dec 2026 → 12 Jan 2027
Synthetic revision
19 Oct 2026

05 Oct 2026 snapshot

OCTNOVDECJANFEBMAR
Expected study
Application
Study evidence
Next milestone

19 Oct 2026 snapshot

OCTNOVDECJANFEBMAR
Expected study
Application
Study evidence
Next milestone
○ Prior source value retained● Changed field, not an approval
02 / Source

Open the record behind the change.

A source row explains what changed. It does not explain away the older study note or the missing evidence.

DEMO · SYNTHETIC DATA
FICTIONAL SOURCE / QUEUE-SYN-101 / ROW 14

One change.
A source you can inspect.

Expected study date
15 Dec 2026 → 12 Jan 2027
Snapshot / retrieved19 Oct 2026
Prior snapshot05 Oct 2026
Observed: the date changed.
Not established: cause, capacity or a better project outcome.
Inspect the synthetic record ↗
03 / Exception

Make the unknown impossible to miss.

The two sites have different evidence gaps. Neither receives a fabricated capacity score.

DEMO · SYNTHETIC DATA

Cedar Junction Storage

SYN-101
Queue source19 Oct 2026 ↗
Study evidenceOlder summary
Reviewer stateFurther evidence required
Capacity assumption remains unverified. Requires engineer review.

Mesa Reach Solar

SYN-102
Queue source19 Oct 2026 ↗
Study evidenceDocument missing
Reviewer stateFurther evidence required
Study material needs to be supplied before comparison.
04 / Packet

Keep the reservations with the record.

The packet carries the observed change, source references, unverified assumption and next action into human review.

DEMO · SYNTHETIC DATA
Review packet / 02 sitesSynthetic

Project Evidence
Packet

Cedar Junction + Mesa Reach

CaseSYN-101 / SYN-102
Snapshot19 Oct 2026
ReviewFurther evidence required
One unresolved assumption +

Capacity remains unverified. Obtain appropriate study evidence before interpreting electrical headroom.

NOT A GRID STUDY

Evidence prepared for human review. No interconnection approval.

DEMO · SYNTHETIC DATAInspect packet →
The review

Two sites.
One clear view
of what is unknown.

Different sources, different evidence, the same questions. Bring site information together and see exactly what still needs a human review.

Explore Grid Review ↗

Cedar Junction Storage

SYN-101
Queue source19 Oct 2026 ↗
Study evidenceOlder summary
Reviewer stateFurther evidence required
Capacity assumption remains unverified. Requires engineer review.

Mesa Reach Solar

SYN-102
Queue source19 Oct 2026 ↗
Study evidenceDocument missing
Reviewer stateFurther evidence required
Study material needs to be supplied before comparison.
The packet

A decision deserves
a traceable record.

Bring the sources, notes and open questions together in one clear packet for the next engineer review.

Human review. Explicit uncertainty.
No grid control.

Review packet / 02 sitesSynthetic

Project Evidence
Packet

Cedar Junction + Mesa Reach

CaseSYN-101 / SYN-102
Snapshot19 Oct 2026
ReviewFurther evidence required
One unresolved assumption +

Capacity remains unverified. Obtain appropriate study evidence before interpreting electrical headroom.

NOT A GRID STUDY

Evidence prepared for human review. No interconnection approval.

DEMO · SYNTHETIC DATAInspect packet →
06 / One record across the work

Nothing important
loses its source.

The case record joins observations, exceptions, reviewer notes and outputs. Each product contributes to the same defensible history.

Explore the platform ↗
07 / Built around developer work

From the first screen
to the next milestone.

Four handoffs. One connected record.Scroll to explore ↓
01 / Origination → interconnection engineer

Screen sites, with a traceable handoff.

Bring two candidate sites into the same evidence frame. Identify the unknowns before deciding where to spend more diligence effort.

Explore this workflow →
Developer workflow · Synthetic preview
SYN-101

Cedar Junction Storage

Assumption unverified
SYN-102

Mesa Reach Solar

Study missing
02 / Operator → engineer reviewer

Prepare applications, with a traceable handoff.

Match the application packet to a configured requirement set. Keep missing and conflicting information visible.

Explore this workflow →
Developer workflow · Synthetic preview
Evidence register / SYN-1013 sources
05 OCT19 OCT 2026REVIEW
01Queue snapshot19 Oct 2026Current revision+

Expected study date moved to 12 Jan 2027. The prior value remains in the record.

QUEUE-SYN-101 · ROW 14
02Study summaryEarlier snapshotOlder evidence+

The summary predates the queue revision. It cannot explain the change without further review.

SYNTHETIC REFERENCE · HUMAN REVIEW
03Requirement setNot configuredEvidence gap+

No actual tariff rules are loaded. Application completeness cannot be established.

SYNTHETIC REFERENCE · HUMAN REVIEW
Different dates. One traceable record.DEMO
03 / Engineer → accountable director

Compare scenarios, with a traceable handoff.

Compare supplied assumptions and record the independent reviewer’s reservations.

Explore this workflow →
Developer workflow · Synthetic preview
Supplied scenario comparisonIllustrative
Evidence fieldScenario AScenario B
Queue snapshot05 Oct19 Oct
Expected study15 Dec 202612 Jan 2027
Capacity evidenceUnverifiedUnverified
Study materialOlder summaryNot supplied
!

Different assumptions.
Engineer review required.

Synthetic supplied inputs · No grid study performed
04 / Portfolio manager → named owner

Track portfolios, with a traceable handoff.

Follow the next milestone with its evidence, uncertainty and accountable next action.

Explore this workflow →
Developer workflow · Synthetic preview
Portfolio / next actions2 sites
SYN-101

Cedar Junction

12 Jan 2027

Review revised dateNamed engineer · next action

SYN-102

Mesa Reach

Date unknown

Obtain study materialNamed engineer · next action

DEMO · Fixed illustrative recordsNo live telemetry
01 / 04Skip section ↓
08 / Clear authority boundaries

Review remains
with the engineer.

Evidence support has a specific place in the process. It does not replace accredited engineering, utility studies or ISO approval.

See the boundaries ↗

Evidence available

  • Dated source changes
  • Missingness and conflicts
  • Reviewer questions
  • Exportable record

Human authority

  • Engineering decisions
  • Study acceptance
  • Utility / ISO approval
  • No product dispatch
09 / A useful first test

Start with two sites
you already screened.

Compare an evidence packet against your historical assessment. Agree on the baseline, evaluator and failure threshold before the work begins.

Proposed $4,000 manually assisted assessment.
Price test hypothesis. No payment is collected here.

Previously screened

Site A

Historical assessment
Previously screened

Site B

Historical assessment
01 / Named interconnection engineer○ Required
02 / Authorized redacted evidence○ Required
03 / Baseline + evaluation rubric○ Required
04 / Conditional paid statement of work○ Required
10 / Before you begin

Good questions
come first.

Is this a grid study?

No. InterConnectTrack is a research-stage concept for read-only evidence support. Accredited engineering, utility/ISO studies and approval remain outside its authority.

Which regions and rules are supported?

The prototype has one explicitly synthetic example. Real jurisdiction-specific workflows will only be demonstrated after the actual dated rules are loaded and reviewed.

What is connected to this demo?

Nothing external. It uses a fixed invented queue event log and mock project records. There is no dispatch, utility writeback or production connector.

What would a two-site evaluation need?

Two previously screened sites, authorized redacted queue/study evidence, a named engineer, a historical comparator, a pre-agreed rubric and conditional paid SOW.

Are the proposed prices final?

No. Each price is an interview-test hypothesis and a separate scope discussion, not an accepted market rate or active checkout.

Who owns the decision?

A named developer-side engineer reviews consequential assumptions. The product does not approve a connection, certify capacity or make physical/control decisions.

Company news / Funding announcement

The next chapter.
Details to come.

Funding information will appear here once it is ready to be announced.

Company enquiries →
Funding amount

To be announced

Investors / VC

To be announced

Announcement placeholder. No funding round or investor participation is confirmed here.

Bring two sites.
Test whether the evidence is useful.

A manually assisted evaluation. Your historical assessment. A named engineer. A decision based on what the evidence can support.

Proposed evaluation · No payment collected in this prototype