Platform

A connected record.
A human-owned decision.

Source evidence, exceptions, reviewer actions and exportable packets share one case ID.

Concept preview · Synthetic examples

Observe before interpreting

Each input has a source reference, snapshot date, retrieval time and missingness. Observation and analyst interpretation are separate.

FICTIONAL SOURCE / QUEUE-SYN-101 / ROW 14

One change.
A source you can inspect.

Expected study date
15 Dec 2026 → 12 Jan 2027
Snapshot / retrieved19 Oct 2026
Prior snapshot05 Oct 2026
Observed: the date changed.
Not established: cause, capacity or a better project outcome.
Inspect the synthetic record ↗

Review with the unknowns intact

Human reviewers own consequential decisions. Alternative explanations and unresolved assumptions remain visible.

Cedar Junction Storage

SYN-101
Queue source19 Oct 2026 ↗
Study evidenceOlder summary
Reviewer stateFurther evidence required
Capacity assumption remains unverified. Requires engineer review.

Mesa Reach Solar

SYN-102
Queue source19 Oct 2026 ↗
Study evidenceDocument missing
Reviewer stateFurther evidence required
Study material needs to be supplied before comparison.

Keep the record portable

The packet export is reversible and retains labels, sources, uncertainty and the next action.

Review packet / 02 sitesSynthetic

Project Evidence
Packet

Cedar Junction + Mesa Reach

CaseSYN-101 / SYN-102
Snapshot19 Oct 2026
ReviewFurther evidence required
One unresolved assumption +

Capacity remains unverified. Obtain appropriate study evidence before interpreting electrical headroom.

NOT A GRID STUDY

Evidence prepared for human review. No interconnection approval.

DEMO · SYNTHETIC DATAInspect packet →

Bring two sites.
Test whether the evidence is useful.

A manually assisted evaluation. Your historical assessment. A named engineer. A decision based on what the evidence can support.

Proposed evaluation · No payment collected in this prototype