Methodology

Keep observation, interpretation
and review distinct.

A source-linked case carries input timestamps, missingness, analyst annotations, alternative explanations and a reviewer decision.

Concept preview · Synthetic examples
FICTIONAL SOURCE / QUEUE-SYN-101 / ROW 14

One change.
A source you can inspect.

Expected study date
15 Dec 2026 → 12 Jan 2027
Snapshot / retrieved19 Oct 2026
Prior snapshot05 Oct 2026
Observed: the date changed.
Not established: cause, capacity or a better project outcome.
Inspect the synthetic record ↗

Source handling

Preserve source URL/reference, published date, effective date, retrieved date and snapshot version separately. When dates are unavailable, state the missingness rather than inventing it.

Evidence register / SYN-1013 sources
05 OCT19 OCT 2026REVIEW
01Queue snapshot19 Oct 2026Current revision+

Expected study date moved to 12 Jan 2027. The prior value remains in the record.

QUEUE-SYN-101 · ROW 14
02Study summaryEarlier snapshotOlder evidence+

The summary predates the queue revision. It cannot explain the change without further review.

SYNTHETIC REFERENCE · HUMAN REVIEW
03Requirement setNot configuredEvidence gap+

No actual tariff rules are loaded. Application completeness cannot be established.

SYNTHETIC REFERENCE · HUMAN REVIEW
Different dates. One traceable record.DEMO

Exceptions are part of the output

A missing document, conflicting value or stale source remains visible. A packet must not silently convert uncertainty into a clean score.

Cedar Junction Storage

SYN-101
Queue source19 Oct 2026 ↗
Study evidenceOlder summary
Reviewer stateFurther evidence required
Capacity assumption remains unverified. Requires engineer review.

Mesa Reach Solar

SYN-102
Queue source19 Oct 2026 ↗
Study evidenceDocument missing
Reviewer stateFurther evidence required
Study material needs to be supplied before comparison.

Evaluate independently

Pre-register the baseline, evaluator, comparison method, observation window and failure threshold. Any unsourced capacity conclusion presented as authoritative is a failure.

Previously screened

Site A

Historical assessment
Previously screened

Site B

Historical assessment
01 / Named interconnection engineer○ Required
02 / Authorized redacted evidence○ Required
03 / Baseline + evaluation rubric○ Required
04 / Conditional paid statement of work○ Required